|
| Document Name | View | Register |
WCF-077-10 - LAKE SHORE BIOSOLID FORCE MAIN EXTENSION - LAKE SHORE BLVD. |  |  |
DRAWINGS |  | |
PRE-BID ATTENDEES |  | |
ADDENDUM (1) - EXTENDED BID OPENING DATE TO SEPTEMBER 14, 2010 |  | |
ADDENDUM (2) - EXTENDED BID OPENING DATE TO SEPTEMBER 21, 2010 |  | |
ADDENDUM (2) - GEOTECH REPORT |  | |
ADDENDUM (2) - DRAWINGS |  | |
JPS-080-10 - GPS IMPLEMENTATION |  |  |
PRE-BID ATTENDEES |  | |
ADDENDUM (1) EXTENDED BID OPENING DATE TO AUGUST 31, 2010 |  | |
ADDENDUM (2) - EXTENDED BID OPENING DATE TO SEPTEMBER 8, 2010 |  | |
ADDENDUM (3) - EXTENDED BID OPENING DATE TO SEPTEMBER 21, 2010 |  | |
JXF-081-10 - TECHNOLOGY SERVER AND DESKTOP EQUIPMENT |  |  |
ADDENDUM (1) |  | |
ADDENDUM (2) - EXTENDED BID OPENING DATE TO AUGUST 31, 2010 |  | |
ADDENDUM (3) |  | |
ADDENDUM (4) - EXTENDED BID OPENING DATE TO SEPTEMBER 8, 2010 |  | |
ADDENDUM (5) |  | |
ADDENDUM (6) - EXTENDED BID OPENING DATE TO SEPTEMBER 14, 2010 |  | |
JSC-079-10 - REPAIR AND INSTALLATION OF INDUSTRIAL AUTOMATIC GATE AND DOOR SYSTEM |  |  |
PRE-BID ATTENDEES |  | |
JPS-001-11 - PROGRAM MANAGER SERVICES FOR THE TOTAL WATER MANAGEMENT PLAN PROJECT |  |  |
PM STANDARD EVALUATION MATRIX |  | |
JEA TWMP SEGMENTS 1, 3, 4 & 5 ALIGNMENT STUDY |  | |
JEA TWMP SEGMENT 6 ALIGNMENT STUDY |  | |
JEA TWMP SEGMENT 2 - HDD SOIL BORINGS |  | |
JEA TWMP SEGMENT - MAP |  | |
ADDENDUM (1) |  | |
PRE-BID ATTENDEES |  | |
JPS-083-10 - WEB CONTENT MANAGEMENT (WCM) AND SITE IMPLEMENTATION |  |  |
PRE-BID ATTENDEES |  | |
ADDENDUM (1) |  | |
WSC-084-10 - RESIDUALS HAULING |  |  |
2nd Revision for RFQ for DESIGN SERVICES Revised 9-1-10 - (Click on the View Box to Print - Do not Register) |  |  |
ADDENDUM (2) Redline Revision-9-1-10 |  | |
|